Operations Board Pack

Constraint economics, control assurance, TARP status, decision governance, turnaround readiness and forecast trust — assembled from platform records, with the source entity named against every figure.

Automated Executive Board Synthesis (Verified ROI, Brier Calibration & Barrier Assurance)

Compiles independently verified savings, Brier score forecast calibration, SIF/barrier posture, TARP status and shift handover state.

Verified Savings

A$0

Pending Savings

A$0

Handover Ready

1 / 4

Calibration Hit Rate

N/A

Brier Score

N/A

Impaired Barriers / SIFs

5 / 0

Overdue SLA Actions

5

• Production & Constraint Posture: Value-chain sustained throughput is 2140 t/h constrained at Prestrip & dragline overburden (9 critical-risk assets monitored).

• Audited Value Realization: A$0 independently verified in SavingsLedgerEntry; A$0 remains in projected/in-progress verification and is excluded from realized board totals.

• Process Safety & Geotechnical Assurance: 5 safety-critical element(s) require verification/remediation, 0 SIF loop(s) are bypassed or failed proof test, and 0 TARP plan(s) are above green baseline.

• Operational Readiness & Acceptance Gates: 1 of 4 ReadinessPassport record(s) have completed full 4-dimension verification, PSSR sign-off (2 signed), and post-start telemetry stabilization.

• Forecast Calibration & Governance: Predictive calibration across 0 verified outcomes stands at N/A% hit rate (Brier score N/A), with 0 governed decision(s) awaiting approval and 5 overdue operating action(s).

Shift Handover: Latest Shift
Recorded shift handover state

Production constraint & margin exposure

Source records: CoalProductionShift, FlowsheetStage, CommodityProfile

Governing constraint

Prestrip & dragline overburden

CHPP feed rate (14-day)

1,546 t/h

72% of 2,140 t/h design

Railed vs plan

17,382 t short

95% of plan over 14 days; prime waste 90% of plan

Revenue deferred

A$221,981/day

Railing shortfall at A$179/t (DEMO basis: US$118/t gC NEWC 6,000 NAR at 0.66 AUD/USD, the same basis Coal Command uses. Replace with Bengalla's realised price.)

Operational readiness & acceptance gates

Source records: ReadinessPassport

Passports in register

4

Handover ready (verified)

1

PSSR signed off

2

Awaiting gate clearance

3

CHPP restart after 14 Oct planned shutdown (DEMO)

restart · Bengalla Mine (Hunter Valley) · Rev 1

Released

CV-04 reclaim conveyor belt splice (DEMO)

maintenance · Bengalla Mine (Hunter Valley) · Rev 1

Handover Ready

DMC pump bearing and gland rebuild (DEMO)

maintenance · Bengalla Mine (Hunter Valley) · Rev 2

Gate Hold

DL-01 drag rope change (DEMO)

maintenance · Bengalla Mine (Hunter Valley) · Rev 1

Gate Hold

Critical control assurance

Source records: SafetyCriticalElement

Controls registered

12

Not fully effective

2

Verification overdue

5

Never assessed

0

Conveyor belt rip detection (CV-02)

Belt rip causing fire and long outage · verify by 2026-10-31

failed

Stockpile thermal monitoring

Spontaneous combustion · verify by 2026-10-27

degraded

Dragline boom structural monitoring

Structural failure of the dragline boom · verify by 2026-10-24

overdue

Highwall prism monitoring

Ground failure (highwall) · verify by 2026-10-27

effective

Spoil dump stability inspection

Ground failure (spoil) · verify by 2026-10-26

effective

HV isolation and earthing (dragline)

Electric shock and arc flash · verify by 2026-10-23

verification due

Tailings, ground control & TARP status

Source records: TARPlan, TailingsFacility, TailingsAssuranceItem

TARPs above normal

1 of 2

Declared level behind instruments

0

Assurance items open

0 (0 overdue)

Facilities in register

0

Dragline spoil movement TARP

Survey displacement rate · declared level 1

level 1 — 6.4 mm/day

Decision & accountability governance

Source records: IntelligenceDecision, OperatingAction

Decisions awaiting approval

0

Implemented, not yet verified

0

Open actions / escalated

10 / 3

Failed verifications

0

Disposition DL-01 boom NDT indications

Mei Lin · due 10/25/2026

site leadership

Close HV protection testing overdue

Priya Natarajan · due 10/20/2026

supervisor

Dam safety surveillance report

Environment Superintendent · due 10/24/2026

supervisor

Turnaround readiness

Source records: TurnaroundScope

Scopes in planning

0

Fully gated

0

Schedule exceeds window

0

Forecast trust & verified value

Source records: PredictionAccuracy, SavingsLedgerEntry

Scored predictions

0

Claimed vs observed

insufficient scored records

Verified savings

A$0

0 entries independently verified

Projected, unverified

A$0

0 entries — not yet board-reportable

Constants and assumptions are stated inline. Unverified savings and pending forecasts are reported separately and are not board-reportable value.