Manager Dashboard
Overview of team performance, tasks & fleet health
21%
Completion Rate
4/19 tasks
2
Overdue Tasks
Require attention
78
Avg Health Score
9 critical assets
4/12
Available Techs
3 active work orders
Task Types
Task Status Overview
Cost Summary (Last 30 days)
Estimated (all work orders)
A$7.4M
Spent to date
A$387K
5% of estimate committed
Variance on costed jobs
-A$501K
52 work orders with actuals · -56% vs their estimate
Team Performance
Luke Moran
100%
completion
Mei Lin
100%
completion
Daniel O'Connell
50%
completion
Ash Patel
25%
completion
Sam Whitfield
0%
completion
Priya Natarajan
0%
completion
Tegan Fraser
0%
completion
Josh Kearney
0%
completion
Rhys Thompson
0%
completion
Holly Brennan
0%
completion
Active Alerts (6)
DL-01: drag rope at 96% of expected life
Drag rope has run 2,788 h of a 2,900 h expected life with strain alarms doubling. Predicted to need change before the Thursday shutdown window.
CV-02: belt rip detection fault
Rip detection on the overland belt is reporting a loop fault; two splices show defects on the last scan.
CHPP Desliming Screen DS-2: temperature above warning limit
CHPP-Desliming-Screen-TEMP reads 85.5 °C against a warning limit of 85 °C. The value has risen steadily over the last three weeks.
CHPP Product Centrifuge CF-1: vibration trending to warning limit
CHPP-Product-Centrifuge-VIBR reads 6.6 mm/s RMS against a warning limit of 7.1 mm/s RMS. The value has risen steadily over the last three weeks.
Pit Dewatering Pump PD-1: current trending to warning limit
Pit-Dewatering-Pump-CURR reads 450.5 A against a warning limit of 520 A. The value has risen steadily over the last three weeks.
Dragline (primary overburden): temperature trending to warning limit
Dragline-primary-overburden-TEMP reads 76.8 °C against a warning limit of 85 °C. The value has risen steadily over the last three weeks.