Role-based control
Operating Views
The same governed evidence, prioritised for each accountable operating role.
Critical assets
9
Control exceptions
5
TARP exceedances
1
Awaiting decisions
0
Role-prioritised operating queue
Ranked from current source records; site controls and approved limits remain authoritative.
Dragline spoil movement TARP
Survey displacement rate 6.4 mm/day — measured level 1, declared level 1
Evidence: Tar plan: current value, current level
Prestrip & dragline overburden
Current throughput not recorded; design 2140 t/h
Evidence: Flowsheet stage: current throughput tph, design capacity tph
Dragline boom structural monitoring
overdue; accountable role Dragline Superintendent
Evidence: Safety critical element: status, accountable role
Conveyor belt rip detection (CV-02)
failed; accountable role Fixed Plant Superintendent
Evidence: Safety critical element: status, accountable role
Stockpile thermal monitoring
degraded; accountable role CHPP Superintendent
Evidence: Safety critical element: status, accountable role
Assigned response queue
Named ownership, response deadlines and age-based escalation for this operating view.
Rebuild exposed coal inventory before dragline shutdown
Add truck & shovel prestrip hours.
Dam safety surveillance report
Past due · 48hEscalated: supervisorEngage dam engineer.