Coal Intelligence · Bengalla
CHPP & Conveyors
Coal handling and preparation plant yield against washability, dense-medium separation efficiency and magnetite, and the remaining life of the belts that carry every tonne to the train.
Demonstration data. 100% of the production, quality, rail, CHPP and dragline records are DEMO records, not site data. Volumes are calibrated to public New Hope figures for Bengalla; shift-level detail is generated. Connect site systems (fleet management, LIMS, CHPP historian, rail scheduling) to replace it.
Plant yield (28d)
61.1%
540.3 kt product
Yield gap to washability (7d)
4.5 pts
baseline 2.9 pts
Organic efficiency
93.1%
actual ÷ theoretical yield
DMC Ep (7d)
0.041
baseline 0.026
Magnetite
0.94 kg/t
baseline 0.63
Feed rate
1,548 t/h
85.0% utilisation
Yield gap cost
185.7 kt
product per year vs baseline gap