Coal Intelligence · Bengalla
Hazards & Environment
Principal hazard management plans, critical control verification and TARP status, with dust, noise, blasting and water monitoring measured against consent limits.
Demonstration data. 100% of the production, quality, rail, CHPP and dragline records are DEMO records, not site data. Volumes are calibrated to public New Hope figures for Bengalla; shift-level detail is generated. Connect site systems (fleet management, LIMS, CHPP historian, rail scheduling) to replace it.
Principal hazards
7
3 on TARP
Critical controls
20
55% assured
Verifications overdue
8
Controls not effective
1
High-potential incidents (12m)
5
Monitors under 20% headroom
3
of 6 monitors