Defect Backlog
Outstanding defects across the portfolio, ranked by urgency
9
Total Defects
7
High Urgency
2
Medium Urgency
A$0
Estimated Cost
| Asset | Location | Condition | Urgency | Action / Description | Est. Cost |
|---|---|---|---|---|---|
| BEN CV-04 Reclaim to Loadout Drive | Bengalla Mine (Hunter Valley) | — | High | Replace or repair in window CHPP-2026-10-28 conveyor (temperature): CV-04-Reclaim-to-TEMP: 78.1 °C rising 1.055/day over 21 days; alarm limit 95 °C (warning 85).. Median remaining life 16 d. | A$0 |
| BEN CHPP Desliming Screen DS-2 | Bengalla Mine (Hunter Valley) | — | High | Replace or repair in window CHPP-2026-10-28 screen (temperature): CHPP-Desliming-Screen-TEMP: 80.06 °C rising 1.19/day over 21 days; alarm limit 95 °C (warning 85).. Median remaining life 13 d. | A$0 |
| BEN CHPP DMC Module 1 Cyclone | Bengalla Mine (Hunter Valley) | — | High | Replace or repair in window CHPP-2026-10-28 Cyclone apex / vortex finder wear: DMC Ep rising 0.62e-3/day (fitted 0.043); performance threshold Ep 0.05. Every 0.01 of Ep costs roughly 1–1.5 points of yield.. Median remaining life 12 d. | A$0 |
| BEN CHPP DM Cyclone Pump 2 | Bengalla Mine (Hunter Valley) | — | High | Replace or repair in window CHPP-2026-10-28 Cyclone apex / vortex finder wear: DMC Ep rising 0.62e-3/day (fitted 0.043); performance threshold Ep 0.05. Every 0.01 of Ep costs roughly 1–1.5 points of yield.. Median remaining life 12 d. | A$0 |
| BEN CHPP Product Centrifuge CF-1 | Bengalla Mine (Hunter Valley) | — | High | Replace or repair in window CHPP-2026-10-28 other (vibration): CHPP-Product-Centrifuge-VIBR: 6.44 mm/s RMS rising 0.205/day over 21 days; alarm limit 11.2 mm/s RMS (warning 7.1).. Median remaining life 23 d. | A$0 |
| BEN CHPP Dense Medium Cyclone Pump | Bengalla Mine (Hunter Valley) | — | High | Replace or repair in window CHPP-2026-10-28 pump (vibration): CHPP-Dense-Medium-VIBR: 7.07 mm/s RMS rising 0.24/day over 21 days; alarm limit 11.2 mm/s RMS (warning 7.1).. Median remaining life 17 d. | A$0 |
| BEN Dragline (primary overburden) | Bengalla Mine (Hunter Valley) | — | High | Replace or repair in window DL-2026-10-29 Bucket teeth: 133 h of 450 h expected life at 15.1 operating h/day; hazard x1 for 28 boom strain alarms (7 d) and fill-factor loss. Median remaining life 18 d. | A$0 |
| BEN Secondary Sizer SZ-201 | Bengalla Mine (Hunter Valley) | — | Medium | Replace or repair in window CHPP-2026-10-28 crusher (vibration): Secondary-Sizer-SZ-201-VIBR: 5.88 mm/s RMS rising 0.177/day over 21 days; alarm limit 11.2 mm/s RMS (warning 7.1).. Median remaining life 30 d. | A$0 |
| BEN Pit Dewatering Pump PD-1 | Bengalla Mine (Hunter Valley) | — | Medium | Replace or repair in window CHPP-2026-10-28 pump (current): Pit-Dewatering-Pump-CURR: 455.96 A rising 2.484/day over 21 days; alarm limit 560 A (warning 520).. Median remaining life 42 d. | A$0 |