Defect Backlog

Outstanding defects across the portfolio, ranked by urgency

9

Total Defects

7

High Urgency

2

Medium Urgency

A$0

Estimated Cost

AssetLocationConditionUrgencyAction / DescriptionEst. Cost
BEN CV-04 Reclaim to Loadout DriveBengalla Mine (Hunter Valley)—
High
Replace or repair in window CHPP-2026-10-28
conveyor (temperature): CV-04-Reclaim-to-TEMP: 78.1 °C rising 1.055/day over 21 days; alarm limit 95 °C (warning 85).. Median remaining life 16 d.
A$0
BEN CHPP Desliming Screen DS-2Bengalla Mine (Hunter Valley)—
High
Replace or repair in window CHPP-2026-10-28
screen (temperature): CHPP-Desliming-Screen-TEMP: 80.06 °C rising 1.19/day over 21 days; alarm limit 95 °C (warning 85).. Median remaining life 13 d.
A$0
BEN CHPP DMC Module 1 CycloneBengalla Mine (Hunter Valley)—
High
Replace or repair in window CHPP-2026-10-28
Cyclone apex / vortex finder wear: DMC Ep rising 0.62e-3/day (fitted 0.043); performance threshold Ep 0.05. Every 0.01 of Ep costs roughly 1–1.5 points of yield.. Median remaining life 12 d.
A$0
BEN CHPP DM Cyclone Pump 2Bengalla Mine (Hunter Valley)—
High
Replace or repair in window CHPP-2026-10-28
Cyclone apex / vortex finder wear: DMC Ep rising 0.62e-3/day (fitted 0.043); performance threshold Ep 0.05. Every 0.01 of Ep costs roughly 1–1.5 points of yield.. Median remaining life 12 d.
A$0
BEN CHPP Product Centrifuge CF-1Bengalla Mine (Hunter Valley)—
High
Replace or repair in window CHPP-2026-10-28
other (vibration): CHPP-Product-Centrifuge-VIBR: 6.44 mm/s RMS rising 0.205/day over 21 days; alarm limit 11.2 mm/s RMS (warning 7.1).. Median remaining life 23 d.
A$0
BEN CHPP Dense Medium Cyclone PumpBengalla Mine (Hunter Valley)—
High
Replace or repair in window CHPP-2026-10-28
pump (vibration): CHPP-Dense-Medium-VIBR: 7.07 mm/s RMS rising 0.24/day over 21 days; alarm limit 11.2 mm/s RMS (warning 7.1).. Median remaining life 17 d.
A$0
BEN Dragline (primary overburden)Bengalla Mine (Hunter Valley)—
High
Replace or repair in window DL-2026-10-29
Bucket teeth: 133 h of 450 h expected life at 15.1 operating h/day; hazard x1 for 28 boom strain alarms (7 d) and fill-factor loss. Median remaining life 18 d.
A$0
BEN Secondary Sizer SZ-201Bengalla Mine (Hunter Valley)—
Medium
Replace or repair in window CHPP-2026-10-28
crusher (vibration): Secondary-Sizer-SZ-201-VIBR: 5.88 mm/s RMS rising 0.177/day over 21 days; alarm limit 11.2 mm/s RMS (warning 7.1).. Median remaining life 30 d.
A$0
BEN Pit Dewatering Pump PD-1Bengalla Mine (Hunter Valley)—
Medium
Replace or repair in window CHPP-2026-10-28
pump (current): Pit-Dewatering-Pump-CURR: 455.96 A rising 2.484/day over 21 days; alarm limit 560 A (warning 520).. Median remaining life 42 d.
A$0