Coal Intelligence · Bengalla
Coal Command
The whole Bengalla value chain on one screen — overburden, coal exposure, CHPP, quality, rail and safety — with every problem priced in tonnes and dollars and routed to an owner.
Demonstration data. 100% of the production, quality, rail, CHPP and dragline records are DEMO records, not site data. Volumes are calibrated to public New Hope figures for Bengalla; shift-level detail is generated. Connect site systems (fleet management, LIMS, CHPP historian, rail scheduling) to replace it.
Data to 2026-10-25 · price basis A$178.79/t at 6000 NAR
ROM vs plan (28d)
96.6%
992.9 kt
Prime OB vs plan
95.4%
6.41 Mbcm
Strip ratio
6.46
bcm per ROM t
Exposed coal cover
9.6 d
-2,855 t/day trend
CHPP yield
61.1%
gap to washability 4.5 pts
Product CV (7d)
5,902
kcal/kg NAR · -5.5/day
Railed vs plan
85.0%
9 trains cancelled
Value at stake
A$138.8M
4 critical · 13 urgent