Supply Chain Lead-Time Risk
Not how much stock is held, but whether it arrives before it is needed — cover measured against the lead time a supplier actually delivers to, and against change-outs that are already due inside their own procurement window.
How the site filter works
Your site choice is remembered across workspace views.
Site filtering uses recorded compatible equipment types, not storage-bin names. Matching parts are candidate shared supply, not confirmed fitment or stock allocated to this site; quantities, usage, costs and lead times retain their full-register basis. Parts without compatibility links remain under All locations. Verify fitment, stock ownership and transfer time before ordering.
29 of 29 loaded parts (limit 300); 31 of 31 fleet units (limit 300). Up to 200 supplier records inform the existing risk model. Component and failure-window calculations follow selected-site assets; decision deduplication retains all loaded decisions.
Parts exposed to lead time
7
Worst gap 153 days with no shelf cover
Order today
7
Cover already inside the lead time
Change-outs already late
5
7 components due within 90 days
Committed spend, 90 days
A$4.2M
Known change-outs, not a forecast
793F C175-16 engine (exchange)
793F-ENG-C175 · Westrac (Caterpillar) (DEMO) · critical criticality
On hand
0
Effective lead time
153d vs 140d quoted
Exposure
153d uncovered
Order by
Today
Out of stock with a 153-day replenishment — any demand now becomes 153 days of downtime. Westrac (Caterpillar) (DEMO) delivers on time 91% of the time, so the quoted lead time is not the planning lead time.
DMC 1000 apex and vortex finder set
DMC-APEX-1000 · Multotec Australia (DEMO) · critical criticality
On hand
0
Effective lead time
31d vs 28d quoted
Exposure
31d uncovered
Order by
Today
0 days of cover against a 31-day lead time — a 31-day gap with nothing on the shelf. Multotec Australia (DEMO) delivers on time 90% of the time, so the quoted lead time is not the planning lead time.
Dragline hoist motor (rotable)
DL-MTR-HOIST-ROT · Hunter Valley Electrical Services (DEMO) · critical criticality
On hand
0
Effective lead time
64d vs 60d quoted
Exposure
64d uncovered
Order by
Today
Out of stock with a 64-day replenishment — any demand now becomes 64 days of downtime. Hunter Valley Electrical Services (DEMO) delivers on time 94% of the time, so the quoted lead time is not the planning lead time.
Dragline hoist rope 83 mm (pair)
DL-ROPE-HOIST-83 · Bridon-Bekaert Ropes Group (DEMO) · critical criticality
On hand
0
Effective lead time
22d vs 21d quoted
Exposure
22d uncovered
Order by
Today
0 days of cover against a 22-day lead time — a 22-day gap with nothing on the shelf. Bridon-Bekaert Ropes Group (DEMO) delivers on time 93% of the time, so the quoted lead time is not the planning lead time.
Screen exciter (rotable)
SCR-EXCITER · Schenck Process Australia (DEMO) · critical criticality
On hand
0
Effective lead time
41d vs 35d quoted
Exposure
41d uncovered
Order by
Today
0 days of cover against a 41-day lead time — a 41-day gap with nothing on the shelf. Schenck Process Australia (DEMO) delivers on time 84% of the time, so the quoted lead time is not the planning lead time.
Sizer gearbox exchange unit
SZ-GBX-625 · MMD Australia (DEMO) · critical criticality
On hand
0
Effective lead time
103d vs 90d quoted
Exposure
103d uncovered
Order by
Today
Out of stock with a 103-day replenishment — any demand now becomes 103 days of downtime. MMD Australia (DEMO) delivers on time 85% of the time, so the quoted lead time is not the planning lead time.
Centrifuge basket H1000
CF-BASKET-H1000 · Schenck Process Australia (DEMO) · high criticality
On hand
0
Effective lead time
81d vs 70d quoted
Exposure
81d uncovered
Order by
Today
Out of stock with a 81-day replenishment — any demand now becomes 81 days of downtime. Schenck Process Australia (DEMO) delivers on time 84% of the time, so the quoted lead time is not the planning lead time.
OTR tyre 59/80R63 (793F)
TYRE-59-80R63 · Bridgestone Mining Solutions (DEMO) · critical criticality
On hand
10
Effective lead time
53d vs 45d quoted
Exposure
None
Order by
2026-11-09
Covered — reorder by 2026-11-09 to stay ahead of the lead time. Bridgestone Mining Solutions (DEMO) delivers on time 82% of the time, so the quoted lead time is not the planning lead time.
OTR tyre 53/80R63 (830E)
TYRE-53-80R63 · Bridgestone Mining Solutions (DEMO) · high criticality
On hand
5
Effective lead time
53d vs 45d quoted
Exposure
None
Order by
2026-11-11
Covered — reorder by 2026-11-11 to stay ahead of the lead time. Bridgestone Mining Solutions (DEMO) delivers on time 82% of the time, so the quoted lead time is not the planning lead time.
Dragline bucket tooth set (ESCO)
DL-GET-TOOTH-SET · ESCO (Weir) (DEMO) · critical criticality
On hand
2
Effective lead time
7d
Exposure
None
Order by
2026-11-24
Covered — reorder by 2026-11-24 to stay ahead of the lead time.
Dragline drag rope 89 mm
DL-ROPE-DRAG-89 · Bridon-Bekaert Ropes Group (DEMO) · critical criticality
On hand
1
Effective lead time
22d vs 21d quoted
Exposure
None
Order by
2027-01-13
Covered — reorder by 2027-01-13 to stay ahead of the lead time. Bridon-Bekaert Ropes Group (DEMO) delivers on time 93% of the time, so the quoted lead time is not the planning lead time.
Dragline trailing cable 3.3 kV (per 300 m)
HV-CABLE-TRAIL · Hunter Valley Electrical Services (DEMO) · critical criticality
On hand
1
Effective lead time
59d vs 56d quoted
Exposure
None
Order by
2027-11-01
Covered — reorder by 2027-11-01 to stay ahead of the lead time. Hunter Valley Electrical Services (DEMO) delivers on time 94% of the time, so the quoted lead time is not the planning lead time.
Steel-cord belt ST2500 1400 mm (per 300 m roll)
BELT-ST2500-1400 · Fenner Dunlop Australia (DEMO) · critical criticality
On hand
2
Effective lead time
171d vs 150d quoted
Exposure
None
Order by
2028-03-06
Covered — reorder by 2028-03-06 to stay ahead of the lead time. Fenner Dunlop Australia (DEMO) delivers on time 86% of the time, so the quoted lead time is not the planning lead time.
Steel-cord splice kit (hot vulcanised)
SPLICE-KIT-SC · Fenner Dunlop Australia (DEMO) · critical criticality
On hand
2
Effective lead time
24d vs 21d quoted
Exposure
None
Order by
2026-11-27
Covered — reorder by 2026-11-27 to stay ahead of the lead time. Fenner Dunlop Australia (DEMO) delivers on time 86% of the time, so the quoted lead time is not the planning lead time.
Warman 14/12 impeller
WRM-1412-IMP · Weir Minerals Australia (DEMO) · critical criticality
On hand
1
Effective lead time
39d vs 35d quoted
Exposure
None
Order by
2027-01-07
Covered — reorder by 2027-01-07 to stay ahead of the lead time. Weir Minerals Australia (DEMO) delivers on time 89% of the time, so the quoted lead time is not the planning lead time.
793F final drive (rotable pair)
793F-FD-PAIR · Westrac (Caterpillar) (DEMO) · high criticality
On hand
1
Effective lead time
98d vs 90d quoted
Exposure
None
Order by
2027-03-28
Covered — reorder by 2027-03-28 to stay ahead of the lead time. Westrac (Caterpillar) (DEMO) delivers on time 91% of the time, so the quoted lead time is not the planning lead time.
Ceramic pulley lagging (per pulley)
PULLEY-LAG-CER · Fenner Dunlop Australia (DEMO) · high criticality
On hand
2
Effective lead time
40d vs 35d quoted
Exposure
None
Order by
2027-04-27
Covered — reorder by 2027-04-27 to stay ahead of the lead time. Fenner Dunlop Australia (DEMO) delivers on time 86% of the time, so the quoted lead time is not the planning lead time.
EX5600 main hydraulic pump set
EX-HYD-PUMP-SET · Komatsu Australia (DEMO) · high criticality
On hand
1
Effective lead time
68d vs 60d quoted
Exposure
None
Order by
2028-01-02
Covered — reorder by 2028-01-02 to stay ahead of the lead time. Komatsu Australia (DEMO) delivers on time 87% of the time, so the quoted lead time is not the planning lead time.
Sizer tooth segment set 625
SZ-SEG-625 · MMD Australia (DEMO) · high criticality
On hand
3
Effective lead time
69d vs 60d quoted
Exposure
None
Order by
2027-02-05
Covered — reorder by 2027-02-05 to stay ahead of the lead time. MMD Australia (DEMO) delivers on time 85% of the time, so the quoted lead time is not the planning lead time.
Steel-cord belt ST1250 1600 mm (per 300 m roll)
BELT-ST1250-1600 · Fenner Dunlop Australia (DEMO) · high criticality
On hand
1
Effective lead time
148d vs 130d quoted
Exposure
None
Order by
2027-02-06
Covered — reorder by 2027-02-06 to stay ahead of the lead time. Fenner Dunlop Australia (DEMO) delivers on time 86% of the time, so the quoted lead time is not the planning lead time.
Turnout crossing nose 1 in 9
TRK-CROSSING-19 · Hunter Valley Electrical Services (DEMO) · high criticality
On hand
1
Effective lead time
64d vs 60d quoted
Exposure
None
Order by
2030-10-02
Covered — reorder by 2030-10-02 to stay ahead of the lead time. Hunter Valley Electrical Services (DEMO) delivers on time 94% of the time, so the quoted lead time is not the planning lead time.
Warman 14/12 liner set
WRM-1412-LINER · Weir Minerals Australia (DEMO) · high criticality
On hand
1
Effective lead time
39d vs 35d quoted
Exposure
None
Order by
2027-01-07
Covered — reorder by 2027-01-07 to stay ahead of the lead time. Weir Minerals Australia (DEMO) delivers on time 89% of the time, so the quoted lead time is not the planning lead time.
Warman bearing assembly
WRM-BRG-ASSY · Weir Minerals Australia (DEMO) · high criticality
On hand
2
Effective lead time
39d vs 35d quoted
Exposure
None
Order by
2027-02-11
Covered — reorder by 2027-02-11 to stay ahead of the lead time. Weir Minerals Australia (DEMO) delivers on time 89% of the time, so the quoted lead time is not the planning lead time.
793F 500 h filter kit
FLT-KIT-793F · Westrac (Caterpillar) (DEMO) · medium criticality
On hand
22
Effective lead time
15d vs 14d quoted
Exposure
None
Order by
2026-11-19
Covered — reorder by 2026-11-19 to stay ahead of the lead time. Westrac (Caterpillar) (DEMO) delivers on time 91% of the time, so the quoted lead time is not the planning lead time.
Flygt 2670 impeller and wear ring
PD-FLYGT-IMP · Hunter Valley Electrical Services (DEMO) · medium criticality
On hand
1
Effective lead time
22d vs 21d quoted
Exposure
None
Order by
2027-01-24
Covered — reorder by 2027-01-24 to stay ahead of the lead time. Hunter Valley Electrical Services (DEMO) delivers on time 94% of the time, so the quoted lead time is not the planning lead time.
Gearbox oil and filter kit (B3SH)
GBX-B3SH-OIL · Flender Australia (DEMO) · medium criticality
On hand
6
Effective lead time
17d vs 14d quoted
Exposure
None
Order by
2027-02-16
Covered — reorder by 2027-02-16 to stay ahead of the lead time. Flender Australia (DEMO) delivers on time 80% of the time, so the quoted lead time is not the planning lead time.
Polyurethane screen panels (set of 40)
SCR-PANEL-PU · Multotec Australia (DEMO) · medium criticality
On hand
3
Effective lead time
23d vs 21d quoted
Exposure
None
Order by
2026-12-08
Covered — reorder by 2026-12-08 to stay ahead of the lead time. Multotec Australia (DEMO) delivers on time 90% of the time, so the quoted lead time is not the planning lead time.
Troughing idler set 152 mm
IDLER-152-TROUGH · Fenner Dunlop Australia (DEMO) · medium criticality
On hand
64
Effective lead time
32d vs 28d quoted
Exposure
None
Order by
2026-11-11
Covered — reorder by 2026-11-11 to stay ahead of the lead time. Fenner Dunlop Australia (DEMO) delivers on time 86% of the time, so the quoted lead time is not the planning lead time.
Transformer oil sample kit (DGA)
TX-OIL-DGA · Hunter Valley Electrical Services (DEMO) · low criticality
On hand
6
Effective lead time
7d
Exposure
None
Order by
2028-08-17
Covered — reorder by 2028-08-17 to stay ahead of the lead time.