Generated directly from the live registers — nothing retyped. Pressure-system inspection, TARP monitoring, safety-critical element verification, safety-instrumented function proof testing, tailings dam safety and GISTM assurance actions, each with its governing requirement and accountable role.

AssetStack — Assurance Evidence Pack

Generated 10/27/2026, 2:29:14 AM. Values are as recorded in the platform at generation time; source records govern. Demonstration records are labelled as such in their names.

Pressure systems — inspection and relief register

API 510 / API 570 / API 653 / AS 3788 as applicable · 6 records
TagSystemDesign / inspection codeMin req / last (mm)Last inspectionMax intervalRelief device / last testStatusGoverning requirement
AR-1CHPP plant air receiver AR-1AS 12109.2 / 10.69/12/20254 yPSV-AR1 · 12/31/2025in_serviceWHS Regulation 2017 (NSW) pressure equipment; AS/NZS 3788 in-service inspection
AR-3MIA workshop air receiver AR-3AS 12107.6 / 8.411/26/20244 yPSV-AR3 · 10/2/2025in_serviceWHS Regulation 2017 (NSW) pressure equipment; AS/NZS 3788 in-service inspection
DL-AR-1Dragline DL-01 brake air system receiverAS 121010.8 / 12.14/10/20262 yPSV-DL1 · 6/29/2026in_serviceWHS Regulation 2017 (NSW) pressure equipment; AS/NZS 3788 in-service inspection
FP-100Fuel farm transfer pipingAS 40414.8 / 5.410/12/20255 yPRV-FP1 · 4/10/2026in_serviceWHS Regulation 2017 (NSW) pressure equipment; AS/NZS 3788 in-service inspection
FT-1Fuel farm bulk diesel tank FT-1 (2 ML)API 653 / AS 19406 / 7.16/14/20255 y—in_serviceWHS Regulation 2017 (NSW) pressure equipment; AS/NZS 3788 in-service inspection
FW-200CHPP fire water ring mainAS 2419.15.5 / 6.12/19/20265 yPRV-FW1 · 9/2/2025deratedWHS Regulation 2017 (NSW) pressure equipment; AS/NZS 3788 in-service inspection

Trigger action response plans — monitoring currency

Site TARPs / ground control and tailings management plans · 2 records
PlanSubjectParameterCurrentDeclared levelLast measuredSourceRequired interval
Dragline spoil movement TARPDragline spoil — Strip 13Survey displacement rate (mm/day)6.4level_110/25/2026, 6:00:00 AMmanual_survey24 h
Highwall Strip 14 displacement TARPHighwall Strip 14Prism displacement rate (mm/day)3.1normal10/26/2026, 1:00:00 AMinstrument · PRISM-HW14-071 h

Safety-critical elements — performance-standard verification

Principal hazard / major accident event management plans · 12 records
ElementHazardPerformance standardVerification methodLast verifiedNext dueStatusAccountable roleGoverning requirement
CHPP fire delugeFire in the CHPPDeluge operates on detection; flow test 6-monthlyFlow test5/16/202611/14/2026verification_dueCHPP SuperintendentAS 1851
Conveyor belt rip detection (CV-02)Belt rip causing fire and long outageRip loops tested weekly; trip within 3 s of loop breakFunctional loop test10/24/202610/31/2026failedFixed Plant SuperintendentMechanical engineering control plan
Conveyor pull-wire emergency stopsEntanglement in conveyorsEvery pull-wire trips the drive within 1 s; tested monthlyPull-wire function test10/14/202611/13/2026effectiveFixed Plant SuperintendentWHS (MPS) Reg — mechanical engineering
Dragline boom structural monitoringStructural failure of the dragline boomStrain alarms acted on within one shift; NDT indications dispositioned before next operationReview strain log and NDT register10/17/202610/24/2026overdueDragline SuperintendentMechanical engineering control plan
HV isolation and earthing (dragline)Electric shock and arc flashIsolation verified by test-before-touch; earth leakage protection tested monthlyEarth leakage trip test9/23/202610/23/2026verification_dueElectrical EngineerElectrical engineering control plan
Haul truck proximity detectionVehicle interactionAll trucks fitted and reporting; alarm tested pre-startSystem health report10/23/202610/30/2026effectiveMining SuperintendentRoads or other vehicle operating areas PHMP
Highwall prism monitoringGround failure (highwall)Prism read every hour; TARP L1 at 5 mm/daySurvey data review10/26/202610/27/2026effectiveGeotechnical EngineerGround or strata failure PHMP
Mine Water Dam wall inspectionDam failureWeekly inspection; piezometers read monthlyInspection record10/22/202610/29/2026effectiveEnvironment SuperintendentDams Safety Act 2015 surveillance
Mobile plant fire suppressionFire on mobile plantSystems serviced 6-monthly to AS 5062; actuation testedService records6/1/202611/30/2026effectiveMaintenance SuperintendentFire or explosion PHMP
Spoil dump stability inspectionGround failure (spoil)Inspected each shift by the dragline supervisor; cracks reportedShift inspection record10/25/202610/26/2026effectiveDragline SupervisorGround or strata failure PHMP
Stockpile thermal monitoringSpontaneous combustionThermal scan daily; TARP L2 at 65 °CThermal camera survey10/26/202610/27/2026degradedCHPP SuperintendentSpontaneous combustion management plan
Windrows on haul roads and dumpsVehicle over edgeWindrow at least half wheel height of the largest vehicleRoad inspection10/21/202610/28/2026effectiveMining SupervisorRoads or other vehicle operating areas PHMP

Safety-instrumented functions — proof-test and PFD screening

IEC 61511 · PFDavg screened as λDU × TI / 2; SIL verification governs · 7 records
TagHazardous eventSILProof-test intervalLast proof testNext dueScreened PFDavgBypassedSRS / standard
SIF-CHPP-03CHPP floor flooding and electrical exposureSIL 112 m9/22/2025 · pass9/22/20262.2e-3 (meets target)NoAS IEC 61511; WHS (Mines) Regulation 2022 (NSW) principal hazard management
SIF-CV2-01Longitudinal belt rip propagating along the overlandSIL 16 m3/31/2026 · fail10/1/20261.3e-3 (meets target)YesAS IEC 61511; WHS (Mines) Regulation 2022 (NSW) principal hazard management
SIF-CV2-02Person caught in moving conveyorSIL 26 m7/24/2026 · pass_with_findings1/24/20273.3e-4 (meets target)NoAS IEC 61511; WHS (Mines) Regulation 2022 (NSW) principal hazard management
SIF-DL-02Uncontrolled drag rope payoutSIL 212 m10/12/2025 · pass10/12/20267.9e-4 (meets target)NoAS IEC 61511; WHS (Mines) Regulation 2022 (NSW) principal hazard management
SIF-DL-01Bucket overwind into boom point sheavesSIL 212 m6/29/2026 · pass6/29/20278.8e-4 (meets target)NoAS IEC 61511; WHS (Mines) Regulation 2022 (NSW) principal hazard management
SIF-FF-01Diesel tank overfill and pool fireSIL 212 m12/1/2025 · pass12/1/20261.1e-3 (meets target)NoAS IEC 61511; WHS (Mines) Regulation 2022 (NSW) principal hazard management
SIF-SZ-01Sizer jam overloading CV-01 feed chuteSIL 112 m5/20/2026 · pass5/20/20271.8e-3 (meets target)NoAS IEC 61511; WHS (Mines) Regulation 2022 (NSW) principal hazard management

Tailings facilities — dam safety register

GISTM / ANCOLD · engineer of record · 2 records
FacilityConsequence classConstructionFreeboard / min (m)FoS drained / undrained / minLast dam safety inspectionLast independent reviewEngineer of recordEPRP / last tested
Fine rejects emplacement FRE-1lowdownstream2.1 / 11.84 / 1.55 / 1.39/17/202612/31/2025Engineer of Record (contracted geotechnical consultant)In place · 5/30/2026
In-pit tailings cell TC-2significantin_pit1.4 / 11.62 / 1.38 / 1.38/14/20269/12/2025Engineer of Record (contracted geotechnical consultant)In place · 4/10/2026

Tailings assurance actions

GISTM requirements, ITRB actions, EPRP drills · 6 records
FacilityItemGISTM referenceAccountable roleDueStatusClosed
Fine rejects emplacement FRE-1Consequence classification review, FRE-1GISTM 4.1Technical Services Manager8/28/2026closed8/28/2026 · Technical Services Manager
Fine rejects emplacement FRE-1Annual dam safety inspection, FRE-1Dams Safety NSWEngineer of Record9/17/2026closed9/17/2026 · Engineer of Record
In-pit tailings cell TC-2Update TC-2 water balance for the surplus seasonGISTM 4.7Environment & Community Superintendent10/21/2026open—
In-pit tailings cell TC-2EoR review of piezometer VP-4 trigger exceedanceGISTM 7.2Engineer of Record11/1/2026in_progress—
In-pit tailings cell TC-2Annual dam safety inspection, TC-2Dams Safety NSWEngineer of Record11/13/2026open—
In-pit tailings cell TC-2Emergency preparedness drill, TC-2GISTM 13.1Emergency Response Coordinator11/26/2026open—