Risk & Assurance

Barrier Health

Every critical control, safety instrumented function, trigger action response plan (TARP) and pressure-containment barrier in one live view, with the reason each one is effective, impaired or unverified.

IEC 61511 SIF (PFDavg) & GISTM Tailings / Ground-Control TARP Co-Optimizer

Computes live Probability of Failure on Demand (PFDavg = λDU·TI/2) and enforces operating interlocks when protection layers or TARP triggers are degraded.

BarrierHazardStateBasisDue / lastOwner

HV isolation and earthing (dragline)

Critical control · Bengalla Mine (Hunter Valley)

Electric shock and arc flashimpairedStatus verification_due, verification overdue2026-10-23Electrical Engineer

Stockpile thermal monitoring

Critical control · Bengalla Mine (Hunter Valley)

Spontaneous combustionimpairedStatus degraded, verification overdue2026-10-27CHPP Superintendent

Spoil dump stability inspection

Critical control · Bengalla Mine (Hunter Valley)

Ground failure (spoil)impairedStatus effective, verification overdue2026-10-26Dragline Supervisor

Highwall prism monitoring

Critical control · Bengalla Mine (Hunter Valley)

Ground failure (highwall)impairedStatus effective, verification overdue2026-10-27Geotechnical Engineer

Conveyor belt rip detection (CV-02)

Critical control · Bengalla Mine (Hunter Valley)

Belt rip causing fire and long outageimpairedStatus failed2026-10-31Fixed Plant Superintendent

Dragline boom structural monitoring

Critical control · Bengalla Mine (Hunter Valley)

Structural failure of the dragline boomimpairedStatus overdue, verification overdue2026-10-24Dragline Superintendent

Dragline spoil movement TARP

Trigger action response plan (TARP) · Dragline spoil — Strip 13

Spoil failure onto exposed coalimpairedDeclared level 12026-10-25Geotechnical Engineer

Highwall Strip 14 displacement TARP

Trigger action response plan (TARP) · Highwall Strip 14

Highwall failureimpairedMeasurement stale2026-10-26Geotechnical Engineer

CHPP fire deluge

Critical control · Bengalla Mine (Hunter Valley)

Fire in the CHPPeffectiveVerified within frequency2026-11-14CHPP Superintendent

Mine Water Dam wall inspection

Critical control · Bengalla Mine (Hunter Valley)

Dam failureeffectiveVerified within frequency2026-10-29Environment Superintendent

Windrows on haul roads and dumps

Critical control · Bengalla Mine (Hunter Valley)

Vehicle over edgeeffectiveVerified within frequency2026-10-28Mining Supervisor

Mobile plant fire suppression

Critical control · Bengalla Mine (Hunter Valley)

Fire on mobile planteffectiveVerified within frequency2026-11-30Maintenance Superintendent

Haul truck proximity detection

Critical control · Bengalla Mine (Hunter Valley)

Vehicle interactioneffectiveVerified within frequency2026-10-30Mining Superintendent

Conveyor pull-wire emergency stops

Critical control · Bengalla Mine (Hunter Valley)

Entanglement in conveyorseffectiveVerified within frequency2026-11-13Fixed Plant Superintendent

An unverified barrier is not treated as effective. States are derived from recorded verification dates, proof tests, TARP levels and thickness measurements against each record's own frequency and limits. The site's safety case, major hazard management plan and engineer-of-record instructions take precedence.