detective
Dragline boom structural monitoring
DL-01
Hazard: Structural failure of the dragline boom
Standard: Strain alarms acted on within one shift; NDT indications dispositioned before next operation
Last verified: 2026-10-17
Next verification: 2026-10-24
Owner: Dragline Superintendent