Skip to page content

Cross-Site Benchmarking

Every gap is measured against the best actual performer in the portfolio, not a target — because "another one of our own sites already does this" is the benchmark no operation can argue with.

Cross-Site Fleet & Component Cohort Survival Learning

Pools Weibull (β, η) survival curves across identical OEM classes across all sites to recalibrate sister assets whose local RUL is optimistic relative to fleet wear-out evidence.

Value of closing every gap

A$0

Per year, if each site matched the portfolio's own best

Setting the standard

Muswellbrook

Composite 100/100

Performance spread

0 pts

Muswellbrook to Bengalla Mine (Hunter Valley)

Operations compared

2

Normalised on a common basis

Site scorecards

#1

Muswellbrook

40 fixed assets · 0 fleet units · 0 stages

100

/100

Cost per tonne

—

Constraint

—

Fixed plant health
Assets at high risk
Fixed plant health
Assets at high risk
#2

Bengalla Mine (Hunter Valley)

0 fixed assets · 31 fleet units · 8 stages

100

/100

Cost per tonne

A$0.79

Constraint

—

Fleet cost per tonne
Fleet availability
Fleet cost per tonne
Fleet availability

4.49Mt forgone to fleet availability gaps

What closing each gap is worth

No closable gaps found

Every site is performing at the portfolio benchmark.

Metric by metric

Fleet cost per tonne

Best 0.79 $/t · Bengalla Mine (Hunter Valley)

Bengalla Mine (Hunter Valley)
0.79 $/t

Fleet availability

Best 86% · Bengalla Mine (Hunter Valley)

Bengalla Mine (Hunter Valley)
86%

Fixed plant health

Best 78 /100 · Muswellbrook

Muswellbrook
78 /100

Assets at high risk

Best 28% · Muswellbrook

Muswellbrook
28%