Energy & Decarbonisation
Every tonne of CO2e here carries a price and every abatement option carries a payback, because decarbonisation only gets funded when it competes on the same terms as any other capital project.
How the site filter works
Your site choice is remembered across workspace views.
Modelled footprint, not an independently verified (NGER) emissions inventory.
Modelled portfolio emissions
566kt CO2e
Scope 1 505kt · Scope 2 61kt
Energy spend
A$203.4M
Carbon exposure A$19.8M at A$35/t
Abatement identified
94kt CO2e
17% of footprint · 74kt of it cash-positive
Lowest intensity site
Bengalla Mine (Hunter Valley)
3.5 kg CO2e per tonne moved
Abatement that pays for itself
74kt of CO2e can be removed on energy-cost grounds alone — worth A$11.5M a year in avoided energy spend for A$110.2M of capital, before any carbon value is counted.
Energy by operation
Bengalla Mine (Hunter Valley)
5 energy streams
Emissions
566kt CO2e
Scope 1 505kt
Energy spend
A$203.4M
Carbon A$19.8M
Emissions intensity
3.5 kg/t
per tonne moved (coal and waste)
Energy cost per tonne
A$1.25
Emissions by source
Marginal abatement cost curve
Trolley assist / battery haulage on fixed routes
−A$105
per tonne CO2e
Renewable PPA
−A$42
per tonne CO2e
Renewable PPA plus 20 MW on-site solar
−A$29
per tonne CO2e
Trolley assist on the North ramp; renewable diesel blend
A$39
per tonne CO2e