Ore-to-Margin Screening

Compare a baseline and an alternative from dry ore through recovered and payable metal to operating margin, with retained calculation evidence.

Production Intelligence
Single-metal screening — explicit assumptions, not a metallurgical forecast
  • Dry ore treated = running feed rate × assessment hours × availability. Enter rate while running, not a rate already reduced for downtime.
  • Contained metal = dry ore × grade fraction; recovered metal = contained × recovery; payable metal = recovered × payability. Percent grade divides by 100; g/t divides by 1,000,000 to obtain tonnes of metal.
  • Revenue = payable metal × price per tonne of metal. Operating margin = revenue − selling deductions − variable ore costs − fixed period costs. Negative margins are retained.
  • Both cases use the same period, commodity, currency and grade unit. Changing currency does not convert monetary inputs; review both cases. Prices must be converted to currency per tonne of payable metal first; gold prices per ounce cannot be entered directly.
  • Selling deductions are an explicitly entered equivalent per payable-metal tonne, not a concentrate-tonnage treatment-charge calculation. Avoid double-counting costs.
  • No automatic hardness-to-throughput or grade-to-recovery relationship is assumed. Recovery, availability, costs and feed rate must have independent evidence for each case.
  • Excludes multi-metal credits, concentrate mass balance, blending, inventory timing, royalties, taxes, capital costs and discounting. Not suitable for oil, gas or bulk-product netback modelling.
Use existing source records (optional)

Stored values are starting evidence, not independently verified measurements. Attach only a stage representing ore feed. A measured average rate may already include downtime and is not copied automatically.

Only profile grade, recovery, price, commodity and currency are copied to baseline. Payability, variable/fixed cost boundaries and all operational assumptions require explicit entries. No source records are changed.

Baseline versus alternative

baseline
alternative

Saved comparisons

Retained inputs, source records and results—not approvals or verified savings. Latest 100 assessments.

No saved comparisons yet.