Mine Plan to Plant

Compare planned feed hardness and abrasion against the current feed at each receiving stage, so throughput and wear pressure show up before that feed arrives.

Mine-to-Mill Physics & Prescriptive Survive-to-Shutdown Derating Optimizer

Couples planned Bond Work Index (Wi) & Abrasion Index (Ai) into Weibull (β, η) scale life and calculates the exact load/feed derating setpoint to reach your next turnaround or spare arrival.

Target Window (d):

8 plan periods · 8 flagged

Nov 2026 · DEMO Bengalla plan

2026-11-01 to 2026-11-30 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)

Hardness vs current

—

Abrasion vs current

—

Screened capacity

—

Plan requires

1588 t/h

  • Hardness comparison unavailable: current or planned work index missing
  • Wear comparison unavailable: abrasion index missing

Dec 2026 · DEMO Bengalla plan

2026-12-01 to 2026-12-31 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)

Hardness vs current

—

Abrasion vs current

—

Screened capacity

—

Plan requires

1418 t/h

  • Hardness comparison unavailable: current or planned work index missing
  • Wear comparison unavailable: abrasion index missing

Jan 2027 · DEMO Bengalla plan

2027-01-01 to 2027-01-31 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)

Hardness vs current

—

Abrasion vs current

—

Screened capacity

—

Plan requires

1515 t/h

  • Hardness comparison unavailable: current or planned work index missing
  • Wear comparison unavailable: abrasion index missing

Feb 2027 · DEMO Bengalla plan

2027-02-01 to 2027-02-28 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)

Hardness vs current

—

Abrasion vs current

—

Screened capacity

—

Plan requires

1682 t/h

  • Hardness comparison unavailable: current or planned work index missing
  • Wear comparison unavailable: abrasion index missing

Mar 2027 · DEMO Bengalla plan

2027-03-01 to 2027-03-31 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)

Hardness vs current

—

Abrasion vs current

—

Screened capacity

—

Plan requires

1513 t/h

  • Hardness comparison unavailable: current or planned work index missing
  • Wear comparison unavailable: abrasion index missing

Apr 2027 · DEMO Bengalla plan

2027-04-01 to 2027-04-30 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)

Hardness vs current

—

Abrasion vs current

—

Screened capacity

—

Plan requires

1592 t/h

  • Hardness comparison unavailable: current or planned work index missing
  • Wear comparison unavailable: abrasion index missing

May 2027 · DEMO Bengalla plan

2027-05-01 to 2027-05-31 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)

Hardness vs current

—

Abrasion vs current

—

Screened capacity

—

Plan requires

1594 t/h

  • Hardness comparison unavailable: current or planned work index missing
  • Wear comparison unavailable: abrasion index missing

June 2027 · DEMO Bengalla plan

2027-06-01 to 2027-06-30 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)

Hardness vs current

—

Abrasion vs current

—

Screened capacity

—

Plan requires

1645 t/h

  • Hardness comparison unavailable: current or planned work index missing
  • Wear comparison unavailable: abrasion index missing

Screening heuristic: at fixed installed power, capacity is scaled by current ÷ planned Bond work index, and wear pressure by the abrasion ratio. Flags trigger above +10% hardness or +15% abrasion. This is not a comminution model or site limit; confirm with metallurgical testwork and the plant's approved throughput model. Required rate assumes 100% run time.