Operations
Mine Plan to Plant
Compare planned feed hardness and abrasion against the current feed at each receiving stage, so throughput and wear pressure show up before that feed arrives.
Mine-to-Mill Physics & Prescriptive Survive-to-Shutdown Derating Optimizer
Couples planned Bond Work Index (Wi) & Abrasion Index (Ai) into Weibull (β, η) scale life and calculates the exact load/feed derating setpoint to reach your next turnaround or spare arrival.
8 plan periods · 8 flagged
Nov 2026 · DEMO Bengalla plan
2026-11-01 to 2026-11-30 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)
Hardness vs current
—
Abrasion vs current
—
Screened capacity
—
Plan requires
1588 t/h
- Hardness comparison unavailable: current or planned work index missing
- Wear comparison unavailable: abrasion index missing
Dec 2026 · DEMO Bengalla plan
2026-12-01 to 2026-12-31 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)
Hardness vs current
—
Abrasion vs current
—
Screened capacity
—
Plan requires
1418 t/h
- Hardness comparison unavailable: current or planned work index missing
- Wear comparison unavailable: abrasion index missing
Jan 2027 · DEMO Bengalla plan
2027-01-01 to 2027-01-31 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)
Hardness vs current
—
Abrasion vs current
—
Screened capacity
—
Plan requires
1515 t/h
- Hardness comparison unavailable: current or planned work index missing
- Wear comparison unavailable: abrasion index missing
Feb 2027 · DEMO Bengalla plan
2027-02-01 to 2027-02-28 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)
Hardness vs current
—
Abrasion vs current
—
Screened capacity
—
Plan requires
1682 t/h
- Hardness comparison unavailable: current or planned work index missing
- Wear comparison unavailable: abrasion index missing
Mar 2027 · DEMO Bengalla plan
2027-03-01 to 2027-03-31 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)
Hardness vs current
—
Abrasion vs current
—
Screened capacity
—
Plan requires
1513 t/h
- Hardness comparison unavailable: current or planned work index missing
- Wear comparison unavailable: abrasion index missing
Apr 2027 · DEMO Bengalla plan
2027-04-01 to 2027-04-30 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)
Hardness vs current
—
Abrasion vs current
—
Screened capacity
—
Plan requires
1592 t/h
- Hardness comparison unavailable: current or planned work index missing
- Wear comparison unavailable: abrasion index missing
May 2027 · DEMO Bengalla plan
2027-05-01 to 2027-05-31 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)
Hardness vs current
—
Abrasion vs current
—
Screened capacity
—
Plan requires
1594 t/h
- Hardness comparison unavailable: current or planned work index missing
- Wear comparison unavailable: abrasion index missing
June 2027 · DEMO Bengalla plan
2027-06-01 to 2027-06-30 · into Coal Handling & Preparation Plant (CHPP) · basis: estimated · LOM 2026 budget (illustrative)
Hardness vs current
—
Abrasion vs current
—
Screened capacity
—
Plan requires
1645 t/h
- Hardness comparison unavailable: current or planned work index missing
- Wear comparison unavailable: abrasion index missing
Screening heuristic: at fixed installed power, capacity is scaled by current ÷ planned Bond work index, and wear pressure by the abrasion ratio. Flags trigger above +10% hardness or +15% abrasion. This is not a comminution model or site limit; confirm with metallurgical testwork and the plant's approved throughput model. Required rate assumes 100% run time.