Mobile Fleet Economics

Cost per tonne moved, unit by unit — with rebuild-versus-replace decided on the cost of the next hour under each option, not on how old the machine looks.

How the site filter works

Your site choice is remembered across workspace views.

Units, summary counts, component change-outs and feed screening follow the recorded fleet site. Cost benchmarks retain class medians across all loaded sites; feed screening retains the existing same-site stage selection and is not a confirmed material route.

Showing 31 of 31 loaded units (limit 300). 0 units have no site and remain under All locations. Production screening loads up to 200 stages. Class buttons filter unit cards only; summary counts cover the selected site.

Blended cost per tonne

A$0.79

A$128.6M/yr across 31 units

Tonnes moved

163.25Mt

Annualised at achieved payload

Fleet availability

86%

4.49Mt forgone to availability gaps

Units needing a decision

0

Rebuild, replace or cost outlier