Operational Readiness & Release Control Centre

Governed Go/No-Go release gates across all nine asset lifecycle stages—coupling statutory compliance, workface materials, crew competencies, PSSR isolations, and 48-hour post-start telemetry stabilization.

← All readiness passports
Bengalla Mine (Hunter Valley) · CHPP dense-medium circuit · Maintenance
Rev 2 · Basis v1
Generic demonstration record

DMC pump bearing and gland rebuild (DEMO)

Configuration: DM cyclone pump 1, rebuilt bearing housing and gland · Duty: Continuous, 2,140 t/h CHPP feed · Governing Ref: DEMO-WO-4471

Gate Verdict

Simulation: Not assessed

Safety statutory

0 / 0

None defined

Technical

0 / 0

None defined

Execution

0 / 0

None defined

Production

0 / 0

None defined

Workface Parts

0 / 0

Staged / reserved

Competencies

0 / 0

Licences verified

Window Clock

T-27h

10/28/2026, 6:00:00 AM

Owner: chpp.maintenance@demo.local·Approver: chpp.manager@demo.local·Verifier: reliability.engineer@demo.local

Current evidence assessment

Simulation: Not assessed

Assessed 10/27/2026, 2:31:38 AM
Refreshes every 30 seconds while open

Safety statutory

No requirements defined

Technical

No requirements defined

Execution

No requirements defined

Production

No requirements defined

Release blockers

  • No site-defined requirements have been recorded.
  • Define a mandatory safety statutory requirement or evidence-backed applicability assessment.
  • Define a mandatory technical requirement or evidence-backed applicability assessment.
  • Define a mandatory execution requirement or evidence-backed applicability assessment.
  • Define a mandatory production requirement or evidence-backed applicability assessment.

No weighted readiness score. Mandatory gaps block release; missing or expired evidence never counts as accepted. Each dimension needs a mandatory requirement or documented applicability assessment; the site approver must still confirm that all applicable requirements are captured.

Requirements & Verified Evidence

No requirements match the selected filter.

Operating basis · revision 2

System / boundaries
CHPP dense-medium circuit
Configuration
DM cyclone pump 1, rebuilt bearing housing and gland
Operating duty
Continuous, 2,140 t/h CHPP feed
Operating window
10/28/2026, 6:00:00 AM — 10/28/2026, 6:00:00 PM
Operating owner
chpp.maintenance@demo.local
Release approver
chpp.manager@demo.local
Authority reference
DEMO-WO-4471
Outcome verifier
reliability.engineer@demo.local
Verification measure
Bearing vibration and housing temperature after 4 h on load
Acceptance criteria
Vibration below 4.5 mm/s and housing below 75 °C
Verification due
10/29/2026, 12:00:00 AM