Operations
Operational Readiness & Release Control Centre
Governed Go/No-Go release gates across all nine asset lifecycle stages—coupling statutory compliance, workface materials, crew competencies, PSSR isolations, and 48-hour post-start telemetry stabilization.
DL-01 drag rope change (DEMO)
Configuration: New drag rope, 2,900 h rated life · Duty: Prime overburden stripping · Governing Ref: DEMO-WO-4480
Gate Verdict
Simulation: Not assessed
0 / 0
None defined
0 / 0
None defined
0 / 0
None defined
0 / 0
None defined
0 / 0
Staged / reserved
0 / 0
Licences verified
T-51h
10/29/2026, 6:00:00 AM
Current evidence assessment
Simulation: Not assessed
Assessed 10/27/2026, 2:31:24 AM
Refreshes every 30 seconds while open
Safety statutory
No requirements defined
Technical
No requirements defined
Execution
No requirements defined
Production
No requirements defined
Release blockers
- No site-defined requirements have been recorded.
- Define a mandatory safety statutory requirement or evidence-backed applicability assessment.
- Define a mandatory technical requirement or evidence-backed applicability assessment.
- Define a mandatory execution requirement or evidence-backed applicability assessment.
- Define a mandatory production requirement or evidence-backed applicability assessment.
No weighted readiness score. Mandatory gaps block release; missing or expired evidence never counts as accepted. Each dimension needs a mandatory requirement or documented applicability assessment; the site approver must still confirm that all applicable requirements are captured.
Requirements & Verified Evidence
No requirements match the selected filter.
Operating basis · revision 1
- System / boundaries
- Dragline DL-01
- Configuration
- New drag rope, 2,900 h rated life
- Operating duty
- Prime overburden stripping
- Operating window
- 10/29/2026, 6:00:00 AM — 10/29/2026, 4:00:00 PM
- Operating owner
- dragline.maintenance@demo.local
- Release approver
- mine.manager@demo.local
- Authority reference
- DEMO-WO-4480
- Outcome verifier
- dragline.engineer@demo.local
- Verification measure
- Rope stretch and socket inspection after first 24 h
- Acceptance criteria
- Stretch within supplier limit; no socket movement
- Verification due
- 10/30/2026, 12:00:00 AM