Governed Go/No-Go release gates across all nine asset lifecycle stages—coupling statutory compliance, workface materials, crew competencies, PSSR isolations, and 48-hour post-start telemetry stabilization.

← All readiness passports
Bengalla Mine (Hunter Valley) · Dragline DL-01 · Maintenance
Rev 1 · Basis v1
Generic demonstration record

DL-01 drag rope change (DEMO)

Configuration: New drag rope, 2,900 h rated life · Duty: Prime overburden stripping · Governing Ref: DEMO-WO-4480

Gate Verdict

Simulation: Not assessed

Safety statutory

0 / 0

None defined

Technical

0 / 0

None defined

Execution

0 / 0

None defined

Production

0 / 0

None defined

Workface Parts

0 / 0

Staged / reserved

Competencies

0 / 0

Licences verified

Window Clock

T-51h

10/29/2026, 6:00:00 AM

Owner: dragline.maintenance@demo.local·Approver: mine.manager@demo.local·Verifier: dragline.engineer@demo.local

Current evidence assessment

Simulation: Not assessed

Assessed 10/27/2026, 2:31:24 AM
Refreshes every 30 seconds while open

Safety statutory

No requirements defined

Technical

No requirements defined

Execution

No requirements defined

Production

No requirements defined

Release blockers

  • No site-defined requirements have been recorded.
  • Define a mandatory safety statutory requirement or evidence-backed applicability assessment.
  • Define a mandatory technical requirement or evidence-backed applicability assessment.
  • Define a mandatory execution requirement or evidence-backed applicability assessment.
  • Define a mandatory production requirement or evidence-backed applicability assessment.

No weighted readiness score. Mandatory gaps block release; missing or expired evidence never counts as accepted. Each dimension needs a mandatory requirement or documented applicability assessment; the site approver must still confirm that all applicable requirements are captured.

Requirements & Verified Evidence

No requirements match the selected filter.

Operating basis · revision 1

System / boundaries
Dragline DL-01
Configuration
New drag rope, 2,900 h rated life
Operating duty
Prime overburden stripping
Operating window
10/29/2026, 6:00:00 AM — 10/29/2026, 4:00:00 PM
Operating owner
dragline.maintenance@demo.local
Release approver
mine.manager@demo.local
Authority reference
DEMO-WO-4480
Outcome verifier
dragline.engineer@demo.local
Verification measure
Rope stretch and socket inspection after first 24 h
Acceptance criteria
Stretch within supplier limit; no socket movement
Verification due
10/30/2026, 12:00:00 AM