Assets & Maintenance
Common-Cause Screen
Finds unplanned work that repeats across different assets sharing a site and asset type, or consuming the same part, so one root cause is fixed once instead of repaired many times.
Same site and asset type
other at Bengalla Mine (Hunter Valley)
8 unplanned jobs · 2 assets
A$7K recorded cost
Assets: BEN CHPP Product Centrifuge CF-1, BEN Dragline (primary overburden)
- BEN-WO-263043 · CF-1 vibration trip reset and inspection
- BEN-WO-263012 · CF-1 vibration trip reset and inspection
- BEN-WO-263016 · CF-1 vibration trip reset and inspection
- BEN-WO-263034 · DL-01 hoist brake adjustment
- BEN-WO-263002 · DL-01 hoist brake adjustment
- BEN-WO-263015 · DL-01 hoist brake adjustment
- +2 more
Next step: check the shared feed, water chemistry, operating practice, part batch or supplier before repeating like-for-like repairs.
Same site and asset type
conveyor at Bengalla Mine (Hunter Valley)
8 unplanned jobs · 2 assets
A$176K recorded cost
Assets: BEN Overland Product Conveyor, BEN CV-04 Reclaim to Loadout Drive
- BEN-WO-263051 · CV-02 emergency splice repair
- BEN-WO-263041 · CV-04 pulley lagging repair
- BEN-WO-263009 · CV-04 pulley lagging repair
- BEN-WO-263003 · CV-02 emergency splice repair
- BEN-WO-263037 · CV-04 pulley lagging repair
- BEN-WO-263013 · CV-02 emergency splice repair
- +2 more
Next step: check the shared feed, water chemistry, operating practice, part batch or supplier before repeating like-for-like repairs.
Same site and asset type
crusher at Bengalla Mine (Hunter Valley)
7 unplanned jobs · 2 assets
A$8K recorded cost
Assets: BEN Secondary Sizer SZ-201, BEN Primary Sizer
- BEN-WO-263032 · SZ-201 coupling replacement
- BEN-WO-263033 · Primary sizer tramp-metal removal and chute repair
- BEN-WO-263026 · SZ-201 coupling replacement
- BEN-WO-263035 · SZ-201 coupling replacement
- BEN-WO-263017 · SZ-201 coupling replacement
- BEN-WO-263014 · Primary sizer tramp-metal removal and chute repair
- +1 more
Next step: check the shared feed, water chemistry, operating practice, part batch or supplier before repeating like-for-like repairs.
Screening rule: at least 3 corrective or emergency work orders across at least 2 distinct assets within the window, grouped by site and asset type or by consumed part number. Clusters are candidates for root-cause analysis, not confirmed common causes. Limits: 1,000 most recent work orders.