Skip to page content

Assets & Maintenance

Maintenance

Plan tasks, manage work orders and retain execution evidence.

How the site filter works

Your site choice is remembered across workspace views.

Tasks, work orders and their summaries use linked equipment to match this site. Unlinked records remain visible under All locations; lists load up to 200 recent tasks and work orders.

Decision support, portfolio task generation and the portfolio scheduler retain their existing wider scope; they are not restricted by this display filter.

12

Scheduled

2

Overdue

4

Completed

7

Recommended

🤖
urgent
Scheduled
AI 0.91%
CRITICAL

DL-01 drag rope change

DL-01 drag rope change. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN Dragline (primary overburden)
Oct 29, 2026
8h estimated
Rhys Thompson

AI Suggested Parts:

DL-ROPE-DRAG-89
Est. A$186,000
🤖
urgent
Scheduled
AI 0.72%
CRITICAL

DMC Module 1 apex and vortex finder replacement

DMC Module 1 apex and vortex finder replacement. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN CHPP DMC Module 1 Cyclone
Oct 28, 2026
10h estimated
Ash Patel

AI Suggested Parts:

DMC-APEX-1000
Est. A$72,000
🤖
high
Scheduled
AI 0.84%
CRITICAL

CV-04 gearbox oil change, cooler clean and bearing inspection

CV-04 gearbox oil change, cooler clean and bearing inspection. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN CV-04 Reclaim to Loadout Drive
Oct 28, 2026
8h estimated
Daniel O'Connell

AI Suggested Parts:

GBX-B3SH-OIL
Est. A$7,400
⚠️
urgent
Scheduled
AI 0.82%

CV-02 splice repair (2 splices) and rip-detection loop repair

CV-02 splice repair (2 splices) and rip-detection loop repair. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN Overland Product Conveyor
Nov 7, 2026
30h estimated
Holly Brennan

AI Suggested Parts:

SPLICE-KIT-SC
Est. A$64,000
🤖
urgent
Scheduled
AI 0.8%

DM cyclone pump bearing and impeller change

DM cyclone pump bearing and impeller change. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN CHPP Dense Medium Cyclone Pump
Oct 28, 2026
12h estimated
Ben Galloway

AI Suggested Parts:

WRM-1412-IMP
WRM-BRG-ASSY
Est. A$71,000
🤖
high
Scheduled
AI 0.7%

DS-2 exciter change (bearing temperature)

DS-2 exciter change (bearing temperature). DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN CHPP Desliming Screen DS-2
Nov 11, 2026
8h estimated
Tegan Fraser

AI Suggested Parts:

SCR-EXCITER
Est. A$92,000
🔧
high
Scheduled
CRITICAL

DL-01 weekly shutdown PM

DL-01 weekly shutdown PM. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN Dragline (primary overburden)
Oct 29, 2026
10h estimated
Rhys Thompson

Parts Required:

DL-GET-TOOTH-SET
Est. A$38,000
🔍
medium
Scheduled
CRITICAL

T1 dissolved gas analysis

T1 dissolved gas analysis. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN 66/11 kV Main Substation Transformer T1
Nov 19, 2026
2h estimated
Sam Whitfield

Parts Required:

TX-OIL-DGA
Est. A$900
🔍
high
In Progress

CF-1 basket inspection and vibration analysis

CF-1 basket inspection and vibration analysis. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN CHPP Product Centrifuge CF-1
Oct 26, 2026
4h estimated
Ash Patel
Est. A$3,000
🔍
medium
Scheduled

CV-02 belt ultrasonic thickness survey

CV-02 belt ultrasonic thickness survey. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN Overland Product Conveyor
Nov 1, 2026
6h estimated
Tegan Fraser
Est. A$4,800
🔍
medium
Scheduled

TO-1 geometry check and crossing nose inspection

TO-1 geometry check and crossing nose inspection. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN Rail Loop Turnout TO-1
Oct 27, 2026
3h estimated
Ben Galloway
Est. A$1,500
🔧
medium
Scheduled

CHPP deluge 6-monthly service (AS 1851)

CHPP deluge 6-monthly service (AS 1851). DEMO — generated demonstration record for Bengalla. Replace with site-system data.

BEN CHPP Fire Suppression System
Nov 14, 2026
6h estimated
Rhys Thompson
Est. A$6,800