Maintenance Planning

Configure automated schedules, templates, and AI-driven maintenance workflows

11

Active Plans

0

AI Triggers

321

Tasks Generated

40

Equipment Covered

Pending Generated Tasks

1 Requires Approval
Task TitleTypeScheduled DateHoursActions
DL-01 boom chord NDT and weld repair
predictive
2026-10-2924h

Maintenance Plans

Configure recurring preventive maintenance schedules

Dragline weekly shutdown PM

Time-Based
Auto-Assign

Thursday 10 h shutdown: rope and socket inspection, tooth change, boom walk-down, lube system. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

Every 7 weeks33 tasks generated
Equipment:
BEN Dragline (primary overburden)

Dragline rope inspection (250 h)

Usage-Based
Auto-Assign

Broken-wire count and diameter on hoist and drag ropes every 250 operating hours. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

41 tasks generated
Equipment:
BEN Dragline (primary overburden)

Dragline boom NDT (quarterly)

Time-Based
Auto-Assign

MPI/UT of boom chord lacing welds and tub ring. Driven by structural integrity plan. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

Every 3 months51 tasks generated
Equipment:
BEN Dragline (primary overburden)

Conveyor belt ultrasonic thickness (monthly)

Time-Based
Auto-Assign

Top-cover thickness survey to update wear rate and order-by date. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

Every 1 months51 tasks generated
Equipment:
BEN Overland Product Conveyor
BEN CHPP Feed Conveyor
BEN CV-03 Stacker Feed Drive
+1 more

Conveyor idler and pulley inspection (weekly)

Time-Based
Auto-Assign

Acoustic and thermal idler scan, pulley lagging, scrapers, pull-wire test. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

Every 1 weeks57 tasks generated
Equipment:
BEN Overland Product Conveyor
BEN CHPP Feed Conveyor
BEN CV-03 Stacker Feed Drive
+1 more

CHPP fortnightly maintenance day

Time-Based
Auto-Assign

12 h CHPP shutdown: cyclones, pumps, screens, centrifuges, chutes. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

Every 2 weeks12 tasks generated
Equipment:
BEN CHPP DMC Module 1 Cyclone
BEN CHPP DMC Module 2 Cyclone
BEN CHPP Dense Medium Cyclone Pump
+5 more

Rotating plant vibration route (condition-based)

Condition-Based
Auto-Assign

Monthly route plus online triggers when vibration exceeds the ISO 10816 warning zone. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

Health < 65%19 tasks generated
Equipment:
BEN Primary Sizer
BEN Secondary Sizer SZ-201
BEN CHPP Dense Medium Cyclone Pump
+5 more

Transformer DGA and thermography (6-monthly)

Time-Based
Auto-Assign

Oil dissolved-gas analysis and thermal survey of HV plant. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

Every 6 months12 tasks generated
Equipment:
BEN 66/11 kV Main Substation Transformer T1
BEN Dragline Trailing-Cable Substation DS-01

Rail loop and turnout inspection (weekly)

Time-Based
Auto-Assign

Track geometry, turnout crossing and fastenings ahead of train arrivals. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

Every 1 weeks8 tasks generated
Equipment:
BEN Rail Loop Track
BEN Rail Loop Turnout TO-1

Fire suppression test (6-monthly)

Time-Based
Auto-Assign

AS 1851 routine service of CHPP deluge and sprinklers. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

Every 6 months12 tasks generated
Equipment:
BEN CHPP Fire Suppression System

Haul truck 500 h service

Usage-Based
Auto-Assign

PM service for 793F and 830E fleet at 500 h intervals. DEMO — generated demonstration record for Bengalla. Replace with site-system data.

25 tasks generated
Types:
haul truck