Field checklist

Pick a job to work through its steps, log labour and parts, and attach photos. Works offline once a job is opened.

Vibration spectrum to confirm the defect, then bearing/alignment repair on Secondary Sizer SZ-201 at the CHPP maintenance day [PdM:EQ-6adf6fe4a29117b594092da8]

high · due 28 Oct

draft

Confirm the reading and repair on Pit Dewatering Pump PD-1 at the CHPP maintenance day [PdM:EQ-6adf6fe4a29117b594092dbb]

high · due 28 Oct

draft

Vibration spectrum to confirm the defect, then bearing/alignment repair on CHPP Product Centrifuge CF-1 at the CHPP maintenance day [PdM:EQ-6adf6fe4a29117b594092db7]

urgent · due 28 Oct

draft

Thermography and lubrication check, then repair of the overheating component on CHPP Desliming Screen DS-2 at the CHPP maintenance day [PdM:EQ-6adf6fe4a29117b594092db0]

urgent · due 28 Oct

draft

Thermography and lubrication check, then repair of the overheating component on CV-04 Reclaim to Loadout Drive at the CHPP maintenance day [PdM:EQ-6adf6fe4a29117b594092dab]

urgent · due 28 Oct

draft

Loadout chute liner replacement

BEN-WO-263052 · medium · Daniel O'Connell · due 20 Oct

in progress
3 steps

CV-04 pulley lagging repair

BEN-WO-263053 · medium · Mei Lin · due 22 Oct

in progress
3 steps

Primary sizer tramp-metal removal and chute repair

BEN-WO-263054 · high · Daniel O'Connell · due 22 Oct

in progress
3 steps

DL-01 bucket tooth change

BEN-WO-263056 · high · Holly Brennan · due 23 Oct

open
3 steps

DL-01 hoist brake adjustment

BEN-WO-263057 · high · Josh Kearney · due 25 Oct

on hold
3 steps

Loadout chute liner replacement

BEN-WO-263058 · medium · Sam Whitfield · due 26 Oct

on hold
3 steps

Change hoist rope on DL-01 [PdM:DL-01-hoist-rope]

high · due 29 Oct

draft

Condition inspection and planned repair of BEN CHPP Dense Medium Cyclone Pump at the CHPP maintenance day [PdM:EQ-6ad8219f3c20d1359a16d46d]

high · due 28 Oct

draft

Condition inspection and planned repair of BEN CHPP Product Screen at the CHPP maintenance day [PdM:EQ-6ad8219f3c20d1359a16d46e]

high · due 9 Dec

draft

Replace worn apex and vortex finders on DMC #2 at the CHPP maintenance day; run a density tracer test after to confirm Ep [PdM:CHPP-DMC-wear]

urgent · due 28 Oct

draft

Inspect motor cooling (blowers, filters, ducting), check load sharing and insulation resistance (PI test) [PdM:DL-01-motor-windings]

urgent · due 29 Oct

draft

Change bucket teeth on DL-01 [PdM:DL-01-bucket-teeth]

urgent · due 29 Oct

draft

Change drag rope on DL-01 [PdM:DL-01-drag-rope]

urgent · due 29 Oct

draft

Engineer-of-record NDT and crack-growth assessment; weld repair in the next planned shutdown; confirm reduced-duty envelope until then [PdM:DL-01-boom-structure]

urgent · due 29 Oct

draft