Reliability Engine
Open work ranked by production consequence — tonnes at risk × margin, adjusted for bottlenecks, redundancy and buffers (priced on Thermal coal (export, Newcastle)).
Margin at risk
A$0
Work items ranked
30
On the bottleneck
0
Overdue
2
Value-at-stake graph
Combines asset health, sensor excursions, pressure integrity, safety barriers, bypassed trips, spares shortfalls and bottleneck economics into one A$ per day figure for each issue.
48-Hour Post-Maintenance Stabilization & Closed-Loop Verification
Verifies post-overhaul telemetry against acceptance criteria to either log verified savings + Brier calibration or raise an RCA anomaly ticket.