Reliability Engine

Open work ranked by production consequence — tonnes at risk × margin, adjusted for bottlenecks, redundancy and buffers (priced on Thermal coal (export, Newcastle)).

Margin at risk

A$0

Work items ranked

30

On the bottleneck

0

Overdue

2

Value-at-stake graph

Combines asset health, sensor excursions, pressure integrity, safety barriers, bypassed trips, spares shortfalls and bottleneck economics into one A$ per day figure for each issue.

48-Hour Post-Maintenance Stabilization & Closed-Loop Verification

Verifies post-overhaul telemetry against acceptance criteria to either log verified savings + Brier calibration or raise an RCA anomaly ticket.