40 total assets across 1 locations

40

Total Assets

35

Operational

88%

5

Degraded

0

Critical

78%

Avg Health

0

Low RUL (<1yr)

A$376.45M

Replacement Cost

Total CRC

A$254.48M

Written-Down Value

32% consumed

A$11.06M

Annual Depreciation

Straight line

9

Defect Backlog

7 high · 2 med

Showing 40 of 40 equipment

pump

BEN CHPP Dense Medium Cyclone Pump

41
41% life
High defect
RUL5 yrs
Risk
high
ValueA$650.0k
Bengalla Mine (Hunter Valley)
other

BEN Dragline (primary overburden)

52
52% life
High defect
RUL23 yrs
Risk
high
ValueA$185.00M
Bengalla Mine (Hunter Valley)
other

BEN CHPP DMC Module 1 Cyclone

58
58% life
High defect
RUL12 yrs
Risk
high
ValueA$2.00M
Bengalla Mine (Hunter Valley)
other

BEN CHPP Product Centrifuge CF-1

57
57% life
High defect
RUL11 yrs
Risk
medium
ValueA$2.00M
Bengalla Mine (Hunter Valley)
screen

BEN CHPP Desliming Screen DS-2

61
61% life
High defect
RUL9 yrs
Risk
medium
ValueA$1.30M
Bengalla Mine (Hunter Valley)
crusher

BEN Secondary Sizer SZ-201

63
63% life
Medium defect
RUL16 yrs
Risk
medium
ValueA$7.00M
Bengalla Mine (Hunter Valley)
conveyor

BEN CV-04 Reclaim to Loadout Drive

66
66% life
High defect
RUL16 yrs
Risk
medium
ValueA$6.00M
Bengalla Mine (Hunter Valley)
pump

BEN Pit Dewatering Pump PD-1

68
68% life
Medium defect
RUL8 yrs
Risk
medium
ValueA$550.0k
Bengalla Mine (Hunter Valley)
screen

BEN CHPP Product Screen

71
71% life
RUL11 yrs
Risk
medium
ValueA$1.40M
Bengalla Mine (Hunter Valley)
pump

BEN CHPP Tailings Pump TP-1

73
73% life
RUL9 yrs
Risk
medium
ValueA$550.0k
Bengalla Mine (Hunter Valley)
feeder

BEN Reclaim Feeder RF-402

74
74% life
RUL15 yrs
Risk
medium
ValueA$1.80M
Bengalla Mine (Hunter Valley)
motor

BEN CV-02 Overland Drive Motors (3 × 750 kW)

76
76% life
RUL15 yrs
Risk
medium
ValueA$1.10M
Bengalla Mine (Hunter Valley)
other

BEN CHPP DMC Module 2 Cyclone

77
77% life
RUL15 yrs
Risk
medium
ValueA$2.00M
Bengalla Mine (Hunter Valley)
conveyor

BEN CHPP Feed Conveyor

78
78% life
RUL20 yrs
Risk
medium
ValueA$7.50M
Bengalla Mine (Hunter Valley)
transformer

BEN Dragline Trailing-Cable Substation DS-01

80
80% life
RUL20 yrs
Risk
medium
ValueA$2.10M
Bengalla Mine (Hunter Valley)
railway switch

BEN Rail Loop Turnout TO-1

78
78% life
RUL20 yrs
Risk
low
ValueA$900.0k
Bengalla Mine (Hunter Valley)
conveyor

BEN Product Stacker ST-301

79
79% life
RUL24 yrs
Risk
low
ValueA$14.00M
Bengalla Mine (Hunter Valley)
pump

BEN CHPP DM Cyclone Pump 2

79
79% life
High defect
RUL9 yrs
Risk
low
ValueA$550.0k
Bengalla Mine (Hunter Valley)
other

BEN CHPP Reflux Classifier RC-1

80
80% life
RUL16 yrs
Risk
low
ValueA$2.00M
Bengalla Mine (Hunter Valley)
feeder

BEN ROM Bin 1 & Apron Feeder AF-101

81
81% life
RUL16 yrs
Risk
low
ValueA$1.80M
Bengalla Mine (Hunter Valley)
railway track

BEN Rail Loop Track

82
82% life
RUL33 yrs
Risk
low
ValueA$21.00M
Bengalla Mine (Hunter Valley)
screen

BEN CHPP Desliming Screen DS-1

82
82% life
RUL12 yrs
Risk
low
ValueA$1.30M
Bengalla Mine (Hunter Valley)
motor

BEN CV-01 Drive Motor & Gearbox

83
83% life
RUL17 yrs
Risk
low
ValueA$1.10M
Bengalla Mine (Hunter Valley)
other

BEN CHPP Magnetic Separator MS-1

83
83% life
RUL17 yrs
Risk
low
ValueA$2.00M
Bengalla Mine (Hunter Valley)
conveyor

BEN CV-03 Stacker Feed Drive

84
84% life
RUL21 yrs
Risk
low
ValueA$6.00M
Bengalla Mine (Hunter Valley)
dam

BEN Mine Water Dam MWD-1

84
84% life
RUL42 yrs
Risk
low
ValueA$9.00M
Bengalla Mine (Hunter Valley)
crusher

BEN Primary Sizer

84
84% life
RUL21 yrs
Risk
low
ValueA$9.50M
Bengalla Mine (Hunter Valley)
other

BEN CHPP Spirals Circuit

85
85% life
RUL17 yrs
Risk
low
ValueA$2.00M
Bengalla Mine (Hunter Valley)
rock breaker

BEN ROM Rock Breaker RB-101

86
86% life
RUL13 yrs
Risk
low
ValueA$900.0k
Bengalla Mine (Hunter Valley)
transformer

BEN 66/11 kV Main Substation Transformer T1

86
86% life
RUL34 yrs
Risk
low
ValueA$4.20M
Bengalla Mine (Hunter Valley)
tank

BEN CHPP Thickener TH-1

87
87% life
RUL30 yrs
Risk
low
ValueA$6.50M
Bengalla Mine (Hunter Valley)
fire suppression

BEN CHPP Fire Suppression System

88
88% life
RUL22 yrs
Risk
low
ValueA$1.60M
Bengalla Mine (Hunter Valley)
feeder

BEN Reclaim Feeder RF-401

88
88% life
RUL18 yrs
Risk
low
ValueA$1.80M
Bengalla Mine (Hunter Valley)
bin

BEN Train Loadout Bin & Chute

88
88% life
RUL31 yrs
Risk
low
ValueA$16.00M
Bengalla Mine (Hunter Valley)
pump

BEN Raw Water Pump Station RW-1

89
89% life
RUL11 yrs
Risk
low
ValueA$550.0k
Bengalla Mine (Hunter Valley)
other

BEN MIA Workshop Overhead Crane 50 t

90
90% life
RUL18 yrs
Risk
low
ValueA$2.00M
Bengalla Mine (Hunter Valley)
compressor

BEN CHPP Plant Air Compressor C-1

90
90% life
RUL14 yrs
Risk
low
ValueA$450.0k
Bengalla Mine (Hunter Valley)
conveyor

BEN Overland Product Conveyor

90
90% life
RUL27 yrs
Risk
low
ValueA$48.00M
Bengalla Mine (Hunter Valley)
other

BEN CHPP Motor Control Centre MCC-1

91
91% life
RUL18 yrs
Risk
low
ValueA$2.00M
Bengalla Mine (Hunter Valley)
monitoring instrument

BEN Train Loadout Weigh-Bin Load Cells

92
92% life
RUL11 yrs
Risk
low
ValueA$350.0k
Bengalla Mine (Hunter Valley)
operational

BEN CHPP Tailings Pump TP-1

pump • Weir Minerals Warman 10/8 AH

73
Remaining Useful Life

78

days

Failure Probability

73.1%

in next 30 days

Operating Hours

28,800

hours total

Pressure

Latest: 307.16 bar

Avg

310.2

Max

323.6

07:2107:2107:2107:2107:2107:2107:2107:2107:2107:2107:2107:2107:2107:2107:2107:2107:21085170255340

Vibration

Latest: 4.38 mm/s

Avg

3.8

Max

4.4

23:2115:2107:2123:2115:2107:2123:2115:2107:2123:2115:2107:2123:2115:2107:2102468