Assets & Maintenance
Assets
One asset collection, with register, management and visual hierarchy views.
How the site filter works
Your site choice is remembered across workspace views.
Site selection applies to all three asset views.
40
Total Assets
35
Operational
88%5
Degraded
0
Critical
78%
Avg Health
0
Low RUL (<1yr)
A$376.45M
Replacement Cost
Total CRC
A$254.48M
Written-Down Value
32% consumed
A$11.06M
Annual Depreciation
Straight line
9
Defect Backlog
7 high · 2 med
Showing 40 of 40 equipment
pump
BEN CHPP Dense Medium Cyclone Pump
41
41% life
High defect
RUL5 yrs
Risk
high
ValueA$650.0k
Bengalla Mine (Hunter Valley)
other
BEN Dragline (primary overburden)
52
52% life
High defect
RUL23 yrs
Risk
high
ValueA$185.00M
Bengalla Mine (Hunter Valley)
other
BEN CHPP DMC Module 1 Cyclone
58
58% life
High defect
RUL12 yrs
Risk
high
ValueA$2.00M
Bengalla Mine (Hunter Valley)
other
BEN CHPP Product Centrifuge CF-1
57
57% life
High defect
RUL11 yrs
Risk
medium
ValueA$2.00M
Bengalla Mine (Hunter Valley)
screen
BEN CHPP Desliming Screen DS-2
61
61% life
High defect
RUL9 yrs
Risk
medium
ValueA$1.30M
Bengalla Mine (Hunter Valley)
crusher
BEN Secondary Sizer SZ-201
63
63% life
Medium defect
RUL16 yrs
Risk
medium
ValueA$7.00M
Bengalla Mine (Hunter Valley)
conveyor
BEN CV-04 Reclaim to Loadout Drive
66
66% life
High defect
RUL16 yrs
Risk
medium
ValueA$6.00M
Bengalla Mine (Hunter Valley)
pump
BEN Pit Dewatering Pump PD-1
68
68% life
Medium defect
RUL8 yrs
Risk
medium
ValueA$550.0k
Bengalla Mine (Hunter Valley)
screen
BEN CHPP Product Screen
71
71% life
RUL11 yrs
Risk
medium
ValueA$1.40M
Bengalla Mine (Hunter Valley)
pump
BEN CHPP Tailings Pump TP-1
73
73% life
RUL9 yrs
Risk
medium
ValueA$550.0k
Bengalla Mine (Hunter Valley)
feeder
BEN Reclaim Feeder RF-402
74
74% life
RUL15 yrs
Risk
medium
ValueA$1.80M
Bengalla Mine (Hunter Valley)
motor
BEN CV-02 Overland Drive Motors (3 × 750 kW)
76
76% life
RUL15 yrs
Risk
medium
ValueA$1.10M
Bengalla Mine (Hunter Valley)
other
BEN CHPP DMC Module 2 Cyclone
77
77% life
RUL15 yrs
Risk
medium
ValueA$2.00M
Bengalla Mine (Hunter Valley)
conveyor
BEN CHPP Feed Conveyor
78
78% life
RUL20 yrs
Risk
medium
ValueA$7.50M
Bengalla Mine (Hunter Valley)
transformer
BEN Dragline Trailing-Cable Substation DS-01
80
80% life
RUL20 yrs
Risk
medium
ValueA$2.10M
Bengalla Mine (Hunter Valley)
railway switch
BEN Rail Loop Turnout TO-1
78
78% life
RUL20 yrs
Risk
low
ValueA$900.0k
Bengalla Mine (Hunter Valley)
conveyor
BEN Product Stacker ST-301
79
79% life
RUL24 yrs
Risk
low
ValueA$14.00M
Bengalla Mine (Hunter Valley)
pump
BEN CHPP DM Cyclone Pump 2
79
79% life
High defect
RUL9 yrs
Risk
low
ValueA$550.0k
Bengalla Mine (Hunter Valley)
other
BEN CHPP Reflux Classifier RC-1
80
80% life
RUL16 yrs
Risk
low
ValueA$2.00M
Bengalla Mine (Hunter Valley)
feeder
BEN ROM Bin 1 & Apron Feeder AF-101
81
81% life
RUL16 yrs
Risk
low
ValueA$1.80M
Bengalla Mine (Hunter Valley)
railway track
BEN Rail Loop Track
82
82% life
RUL33 yrs
Risk
low
ValueA$21.00M
Bengalla Mine (Hunter Valley)
screen
BEN CHPP Desliming Screen DS-1
82
82% life
RUL12 yrs
Risk
low
ValueA$1.30M
Bengalla Mine (Hunter Valley)
motor
BEN CV-01 Drive Motor & Gearbox
83
83% life
RUL17 yrs
Risk
low
ValueA$1.10M
Bengalla Mine (Hunter Valley)
other
BEN CHPP Magnetic Separator MS-1
83
83% life
RUL17 yrs
Risk
low
ValueA$2.00M
Bengalla Mine (Hunter Valley)
conveyor
BEN CV-03 Stacker Feed Drive
84
84% life
RUL21 yrs
Risk
low
ValueA$6.00M
Bengalla Mine (Hunter Valley)
dam
BEN Mine Water Dam MWD-1
84
84% life
RUL42 yrs
Risk
low
ValueA$9.00M
Bengalla Mine (Hunter Valley)
crusher
BEN Primary Sizer
84
84% life
RUL21 yrs
Risk
low
ValueA$9.50M
Bengalla Mine (Hunter Valley)
other
BEN CHPP Spirals Circuit
85
85% life
RUL17 yrs
Risk
low
ValueA$2.00M
Bengalla Mine (Hunter Valley)
rock breaker
BEN ROM Rock Breaker RB-101
86
86% life
RUL13 yrs
Risk
low
ValueA$900.0k
Bengalla Mine (Hunter Valley)
transformer
BEN 66/11 kV Main Substation Transformer T1
86
86% life
RUL34 yrs
Risk
low
ValueA$4.20M
Bengalla Mine (Hunter Valley)
tank
BEN CHPP Thickener TH-1
87
87% life
RUL30 yrs
Risk
low
ValueA$6.50M
Bengalla Mine (Hunter Valley)
fire suppression
BEN CHPP Fire Suppression System
88
88% life
RUL22 yrs
Risk
low
ValueA$1.60M
Bengalla Mine (Hunter Valley)
feeder
BEN Reclaim Feeder RF-401
88
88% life
RUL18 yrs
Risk
low
ValueA$1.80M
Bengalla Mine (Hunter Valley)
bin
BEN Train Loadout Bin & Chute
88
88% life
RUL31 yrs
Risk
low
ValueA$16.00M
Bengalla Mine (Hunter Valley)
pump
BEN Raw Water Pump Station RW-1
89
89% life
RUL11 yrs
Risk
low
ValueA$550.0k
Bengalla Mine (Hunter Valley)
other
BEN MIA Workshop Overhead Crane 50 t
90
90% life
RUL18 yrs
Risk
low
ValueA$2.00M
Bengalla Mine (Hunter Valley)
compressor
BEN CHPP Plant Air Compressor C-1
90
90% life
RUL14 yrs
Risk
low
ValueA$450.0k
Bengalla Mine (Hunter Valley)
conveyor
BEN Overland Product Conveyor
90
90% life
RUL27 yrs
Risk
low
ValueA$48.00M
Bengalla Mine (Hunter Valley)
other
BEN CHPP Motor Control Centre MCC-1
91
91% life
RUL18 yrs
Risk
low
ValueA$2.00M
Bengalla Mine (Hunter Valley)
monitoring instrument
BEN Train Loadout Weigh-Bin Load Cells
92
92% life
RUL11 yrs
Risk
low
ValueA$350.0k
Bengalla Mine (Hunter Valley)
operational
BEN Mine Water Dam MWD-1
dam • — Earth-fill storage
84
Remaining Useful Life
23376
days
Failure Probability
0.0%
in next 30 days
Operating Hours
0
hours total
water level
Latest: 51.99
Avg
52.2
Max
54.1